Kitchen Remodel Checklist for Logan Homeowners: How to Plan It Step by Step

Bright white kitchen remodel with a wall of windows and an island by ONYX Bros
White kitchen with island and a wall of windows, ONYX Bros
The quick answer

Plan a kitchen remodel in this order:

  • Decide what's not working and whether the layout moves
  • Set a budget from real numbers
  • Check the house: its age, the wiring, and what's behind the walls
  • Hire a licensed contractor with a written contract
  • Choose materials in the order they get installed
  • Get permits (Logan plan review can take up to two weeks)
  • Set up a temporary kitchen before demo day

A lot of kitchen remodel headaches come from doing things out of order: counters picked before cabinets, a permit nobody planned for, or a surprise behind the wall in a 1950s house. This checklist walks through planning a kitchen remodel the way it actually happens in Logan and Cache Valley, with the local rules and resources at each step. When you're ready to talk through your own kitchen, see our kitchen remodeling in Logan page.

01

Decide what you're fixing

  • List what isn't working

    Storage, counter space, traffic flow, lighting, dated finishes. This list becomes your priorities.

  • Decide: same layout or new?

    Keeping the sink, range, and dishwasher in place is the biggest money saver. Moving them means new plumbing, gas, or venting.

  • Measure what you'll keep

    Note sizes for any appliances you're reusing so the new cabinets fit them.

  • Collect photos

    Save kitchens you like, and note what you like about each one. It speeds up design.

02

Set a realistic budget

Start from real benchmarks, not guesses. Logan isn't in the national cost reports, but Salt Lake City is, and the 2026 Houzz & Home Study shows what homeowners actually spent. We break those numbers down in our kitchen remodel cost guide for Logan.

  • Pick a range, not a number

    Decide the most you'd spend and what you'd cut first if bids come in high.

  • Hold back a contingency

    Especially in an older home, set money aside for what the walls might reveal.

03

Check the house before you design

When was your home built?

Roughly 30% of Logan's housing was built before 1970 (NeighborhoodScout, from Census data). Age matters for two reasons:

  • Lead paint: if your home was built before 1978, the EPA requires that paid work disturbing lead-based paint be done by lead-safe certified contractors. Utah's Division of Air Quality runs the state program and lists certified companies.
  • Hidden systems: older homes can have outdated wiring and plumbing behind the walls. Our guide to remodeling an older Logan home covers what tends to show up.

Will you need more power?

An induction range, new appliances, or more lighting can add electrical load. Homes inside Logan city limits get electricity from Logan City Light & Power, the city-owned utility, so changes to your electrical service are coordinated with them. Find out early whether your panel can handle the new kitchen.

Hard water

Logan's water is very hard, about 12 grains per gallon (WaterHardness.org). Factor it into faucet and countertop choices. See our comparison of quartz vs. granite for a Cache Valley kitchen.

04

Hire the right contractor

  • Check the license

    Look them up on Utah's DOPL license lookup before you sign.

  • Get it in writing

    An itemized, written contract shows what's included and is required for Utah lien protection.

  • Read recent reviews

    Look for reviews that mention kitchens and how the contractor handled surprises.

  • Know your lien protection

    If you have a written contract with a licensed contractor and pay in full, Utah's Division of Professional Licensing can issue a Certificate of Compliance if a subcontractor files a lien. The lienholder then has 15 days to remove it (Utah Department of Commerce).

Kitchen remodel in Logan, Utah with wood cabinets, a dark island countertop, and pendant lights by ONYX Bros
Kitchen remodel with a new island, Logan
05

Choose materials in the right order

Each choice limits the next one, so pick them in roughly this order:

  1. Layout and appliancesAppliance sizes set the cabinet layout.
  2. CabinetsUsually the biggest single choice. Keep and reface, semi-custom, or custom.
  3. Countertops and sinkThe counter is cut around the exact sink and cooktop you choose.
  4. BacksplashTile or a full slab, chosen to work with the counters. See our tile installation work.
  5. FlooringOften runs into the next room. See flooring installation.
  6. Lighting, hardware, and trimThe finishing layer. See finish carpentry for built-ins and trim.
06

Permits and schedule

Here's what Logan City's Building Department says:

  • A building permit is generally required for any work on a structure. The city's rule of thumb is to get one for everything except new paint and new floor covering.
  • Projects that need plans can take up to two weeks for plan review, so build that into your start date.
  • If the home isn't owner-occupied, like a rental near USU, the work must be done by a state-licensed contractor.

The order the work happens

  1. DemolitionOld cabinets, counters, and finishes come out.
  2. Rough-inFraming changes, plumbing, electrical, and venting.
  3. InspectionsThe city inspects rough work before walls are closed.
  4. Drywall and paint prepWalls closed and patched.
  5. CabinetsSet, leveled, and secured. Flooring goes in before or after, depending on the material.
  6. CountertopsTemplated after the cabinets are in, then fabricated and installed.
  7. Backsplash, fixtures, appliancesTile, sink, faucet, and appliances connected.
  8. Final inspection and walkthroughPunch list items fixed before the job is called done.
07

Get ready to live without a kitchen

  • Set up a temporary kitchen

    A table with the fridge, microwave, coffee maker, and an electric pan, somewhere away from the dust.

  • Plan for dishes

    Use a laundry or bathroom sink, or stock up on paper plates.

  • Clear the path

    Empty cabinets and the route from the door to the kitchen before demo day.

  • Keep payment records

    Save receipts or canceled checks. They're your proof of payment in full if you ever need lien protection.

How we run a kitchen remodel

We walk your kitchen with you, talk through what you want and what you want to spend, and give you a clear, itemized estimate. When the job needs a permit, we pull it and schedule the inspections. You work directly with owners Ryan and Tyler Wakley from the first walkthrough to the final punch list. See finished projects in our kitchen remodel gallery.

Logan & Cache Valley

Ready to start planning?

We'll walk your kitchen, help you work through this list, and give you a clear, itemized estimate.

Ryan and Tyler Wakley, owners of ONYX Bros in Logan, Utah
From the crew at ONYX Bros

ONYX Bros is a Logan remodeling and general contracting company owned by Ryan and Tyler Wakley, licensed and insured in Utah and Idaho, rated 5.0 on Google, and featured on HouzzTV. More about us.

Kitchen remodel planning FAQ

What is the first step in planning a kitchen remodel?

Decide what isn't working and whether the layout stays the same. Keeping the sink, range, and dishwasher where they are is the biggest money saver, and that one decision shapes your budget, permits, and schedule.

Do I need a permit to remodel my kitchen in Logan?

Usually, yes. Logan City's Building Department says a building permit is generally required for any work on a structure, and its rule of thumb is to get a permit for everything except new paint and new floor covering. Projects that need plans can take up to two weeks for plan review.

My Logan home was built before 1978. Does that change anything?

Yes. The EPA requires that paid renovation work disturbing lead-based paint in homes built before 1978 be done by lead-safe certified contractors. In Utah, the Division of Air Quality runs the lead-based paint program and lists certified companies.

In what order does a kitchen remodel happen?

Typically: demolition, then framing, plumbing, and electrical rough-in, then inspections, drywall, cabinets, countertops (templated after the cabinets are set), backsplash, fixtures and appliances, and a final inspection and walkthrough. Flooring goes in before or after cabinets depending on the material.

How do I check a contractor in Utah?

Look up their license on the Utah Division of Professional Licensing's license lookup, ask for a written, itemized contract, and keep records of every payment. A written contract with a licensed contractor, paid in full, is what qualifies you for Utah's lien protection.

Rules and programs change. This checklist reflects sources available in November 2026. Check with Logan City's Building Department (435-716-9030) for current permit rules.
Previous
Previous

Best Basement Flooring in Logan: LVP vs. Tile vs. Carpet Over Concrete

Next
Next

Quartz vs. Granite Countertops for a Cache Valley Kitchen